📍 Area photo · Electronic City© HokuroN · CC BY-SA 4.0Endeavour Evara
by Endeavour Realtors · Electronic City Phase 1 · South Bengaluru
Project score only — not a price check or legal clearance.
Price is from a listing or old data. We give no fair-price or buy verdict until it's checked.
Scored on 3 of 6 factors · #223 of 325. Analysis, not a recommendation.
No RERA number on file. Title and approvals need a lawyer — Legal Desk.
We don't give a buy or negotiate verdict yet — either the price hasn't been verified with the developer, or unit sizes aren't published so the real ₹/sqft can't be checked. Get the builder's own cost sheet before deciding.
Why
- ● Price and details come from a third-party listing (EstateHive) and haven't been checked with the developer yet.
- ● Endeavour Realtors is not yet rated by AlphaDesk — check its RERA history before booking.
Brochure vs Reality
What the sales pitch says — and what the data says.
- “Metro connectivity”Nearest running station: Electronic City (Yellow) — 1.32 km, an auto ride.✓ Holds up
- “Best price / launch offer”We haven't verified this price with the developer yet, so we don't judge it — compare the builder's cost sheet with nearby projects.? Verify
- “Ready to move”Completed — insist on seeing the Occupancy Certificate (OC) before paying.✓ Holds up
- “Great investment, high appreciation”Likely ~6.7% a year (appreciating) vs ~7% from a bank FD. ₹1 Cr could become ~₹1.38 Cr in 5 years.? Verify
- “24×7 water, premium living”In Electronic City, tanker and borewell dependence is common; flood risk is med. Ask residents of nearby buildings about summer water.✕ Doesn't hold
- “Trusted developer”Endeavour Realtors isn't rated by AlphaDesk yet — check its past projects and complaints on rera.karnataka.gov.in.? Verify
- “All approvals in place”Ask for the RERA number, title deed + 30-year EC, sanctioned plan and (if ready) OC — and verify each yourself.? Verify
Is the price fair?
Unit sizes aren't published, so this ₹/sqft is an estimate and the comparison below is only a rough guide. Get the official cost sheet before judging the price.
Four checks, one project
No construction delay risk — check the OC and snag list before taking keys.
Open the engine →Bear · base · bull yearly return on your cash if rented out, under assumed area growth and rent. Not a forecast.
Open the engine →There's no checked price to negotiate from yet — ask for the builder's itemised cost sheet.
Open the engine →GST, stamp duty and registration on top of the listed ₹61 L (₹68 L in all). Builder charges (parking, club, PLC) aren't included — check them in the Quote Analyzer.
Open the engine →Scenarios use Electronic City's assumed growth and rent, 25% down and an 8.5% loan. Delivery risk is a qualitative read of the builder's record — not a probability for this project.
What taxes add to the listed price
GST, stamp duty, cess and registration on the price on a public listing of ₹61 L. Builder extras like parking, PLC and corpus depend on your unit, so they aren't guessed here.
- GSTdepends
- Stamp duty @ 5%+₹3 L
- Cess (10% of duty)+₹30,260
- Surcharge (2% of duty)+₹6,052
- Registration fee @ 2%+₹1.2 L
Karnataka rules as listed in the Builder Quote Analyzer. Stamp duty is charged on the higher of the price and the guidance value.
Your real commute from here
Peak-hour door-to-door estimates to Bengaluru's big job hubs — by road and, where it's faster, by running metro.
- Electronic City0.5 km🚗 Road8 min🚇 Metro26 minElectronic City → Infosys Foundation Konappana Agrahara
- Koramangala / HSR9.1 km🚗 Road50 min🚇 Metro39 minElectronic City → Central Silk Board
- Sarjapur Road (RGA / Wipro)7.9 km🚗 Road44 min
- ORR tech belt (Bellandur)9.1 km🚗 Road50 min
- Embassy Golf Links / Domlur12 km🚗 Road64 min🚇 Metro95 minElectronic City → Indiranagar · 2 change
- MG Road / CBD15.2 km🚗 Road80 min🚇 Metro75 minElectronic City → Mahatma Gandhi Road · 2 change
Model estimate: road ≈ 17 km/h at peak; metro adds walk/auto to the station and ~2.2 min a stop. Test it once at 9 am before you book.
Score breakdown
The AlphaScore is an analytical project score — not a price check and not a legal clearance. Weights shown in brackets. Left out for lack of evidence: price fairness, builder trust, investment return — the score is re-weighted over the rest, never filled with a guess.
Connectivity, jobs, schools and daily needs
How quickly and well it would sell later
Layout, amenities, maintenance and water
What it costs you every month
Smallest unit (₹61 L), 80% loan at 8.5% for 20 years.
- EMI₹42,017
- Maintenance₹4,600
- Property tax₹403
Estimates: maintenance ≈ ₹4/sqft/month, property tax ≈ 0.08% of value a year. Your bank's rate and the builder's maintenance figure will change these.
Can I afford it?
For a ₹61 L home, 20-year loan.
EMI under 35% of income — healthy. If rates rise 2%, EMI becomes ₹47,529 (19% of income).
Illustration: 5 years at the area's trend
A what-if, not a forecast: the listed (unverified) price grown at Electronic City's estimated trend of 9.5% a year. Area trends are AlphaDesk estimates, and past growth doesn't predict future prices.
Rent (estimate): homes here may earn about 3.6% a year — roughly ₹18,156 a month on a ₹61 L home.
Questions to ask the sales team
Built from what's still unknown about this project. Ask them in writing — keep the answers.
- 1What is the RERA registration number for the tower/phase I'm buying in?
- 2Please share the full cost sheet with carpet area, super built-up area and the loading %.
- 3What is the all-inclusive price: car park, PLC, floor rise, club, BESCOM/BWSSB deposits, legal and corpus?
- 4Can I see the Occupancy Certificate (OC) and the latest khata extract?
- 5Which projects has Endeavour Realtors delivered in Bengaluru, and were they on time?
- 6What is the monthly maintenance per sqft, and how many months' advance do you collect?
- 7Which banks have approved this project for home loans?
- 8Is the water supply Cauvery, borewell or tanker — and what do current residents pay for water?
Endeavour Evara: quick answers
Short, sourced answers — each one stands on its own.
What is the price of Endeavour Evara?
Listings show Endeavour Evara from about ₹61 L, but this price has not been checked with Endeavour Realtors — ask the developer for the latest itemised cost sheet before deciding.
Where is Endeavour Evara located?
Endeavour Evara is in Electronic City Phase 1, in the Electronic City area of South Bengaluru, about 1.32 km (straight line) from Electronic City metro station.
When is possession of Endeavour Evara?
Endeavour Evara is listed as ready to move in. Ask for the occupancy certificate (OC) before you pay.
What home sizes does Endeavour Evara offer?
Endeavour Evara offers 2, 3 BHK.
Who is the developer of Endeavour Evara?
Endeavour Evara is by Endeavour Realtors. AlphaDesk hasn't rated Endeavour Realtors's delivery record yet — check its past projects on the RERA portal.
Is Endeavour Evara a good buy?
AlphaDesk doesn't give a buy verdict on Endeavour Evara until its price is checked with the developer. Its project score is 71/100 on location, builder record and living comfort.
Similar projects nearby
📍 Area photo · Electronic City© HokuroN · CC BY-SA 4.0Sobha Manhattan Towers (Town Park)
by Sobha Limited · Hosur Road, near Electronic City, South BLR
score
Unit sizes aren't published, so the true ₹/sqft can't be judged yet — ask for the official cost sheet.
Data: SOBHA — SOBHA Manhattan Towers, Town Park (official site, checked 2026-10-08) · Oct 2026 · verify with developer
📍 Area photo · Electronic City© HokuroN · CC BY-SA 4.0Purva Silver Sky
by Puravankara (Purva) · Hebbagodi, Huskur Road (Electronic City), South BLR
score
Unit sizes aren't published, so the true ₹/sqft can't be judged yet — ask for the official cost sheet.
Data: Puravankara — Purva Silversky (official site, checked 2026-10-08) · Oct 2026 · verify with developer
📍 Area photo · Electronic City© Glany Saldanha · CC BY 3.0Habulus Meadows
by Habulus Developers · Electronic City Phase 2, South BLR
score
Price and details come from a third-party listing (99acres) and haven't been checked with the developer yet.
Data: 99acres — New projects in Electronic City Phase 2 · Oct 2026 · verify with developer
Scores use AlphaDesk market reference data reviewed July 2026 and analyst assessments; prices change, so confirm the current price list with the builder. Guidance only, not legal or financial advice.
